LatestRACEArticle
24 novembre 2026

Rethinking Rail Throughput

More trains don’t always mean more throughput. Explore why identifying constraints across the entire supply chain can help rail operators make better decisions and improve overall performance.

Why throughput isn't a rail problem

When throughput targets aren't being met, the first instinct is often to look at the rail network. 


  • Do we need more trains? 
  • More locomotives? 
  • More crews? 
  • More capacity? 

 

While these questions are important, they can sometimes distract from the bigger picture. In bulk rail operations, throughput is rarely determined by a single factor. It's the result of hundreds of interconnected decisions made across the supply chain, from production and maintenance through to train scheduling, crew management, and terminal operations. 

 

That's why viewing throughput as a purely rail problem can lead organizations down the wrong path. 

Throughput is an outcome

Throughput isn't something that simply happens on the rail network. It's the outcome of a system working together. 

 

A production increase at a mine may create additional demand on rolling stock. A maintenance outage can reduce asset availability. A change in terminal performance can create network congestion hundreds of miles away. 

 

Each decision influences the next. 

 

The challenge for rail operators is understanding those relationships before they impact operational performance. 

 

Traditionally, different functions across the supply chain have planned within their own area of responsibility. Production plans are developed. Rail plans are developed. Crew plans are developed. Maintenance plans are developed. The problem is that the supply chain doesn't operate in silos. 

 

A change in one area rarely stays there.

The hidden cost of local optimization

One of the most common challenges in bulk rail operations is local optimization. Each department works to achieve its own objectives, often successfully. Yet overall system performance may not improve. 

 

For example: 

 

  • Additional trains may be introduced to increase volume. 
  • Production may be increased to meet demand. 
  • Maintenance schedules may be compressed to maximize availability. 

 

Each decision may deliver benefits locally. However, if those decisions create congestion, increase cycle times, or introduce new constraints elsewhere in the network, overall throughput may remain unchanged or, in some cases, decline. The question operators need to ask is not: 

 

"How do we improve this activity?" 


It's: 


"How do we improve the performance of the entire system?"

Understanding constraints matters

Every bulk rail operation has constraints. Some are obvious. Others are not. 

 

A network may appear to have enough locomotives but be limited by crew availability. Additional train paths may exist, but terminal performance may be preventing higher throughput. Asset utilization may look healthy – and you feel like your “sweating” your assets, while train cycle times reveal a different story. 

 

Identifying the true constraint is often more challenging than solving it. This is where data alone isn't enough. Operators need the ability to evaluate alternatives, understand trade-offs, and test assumptions before implementing changes. 

Moving Beyond Single-Scenario Planning

Many planning processes still rely heavily on developing a single plan and refining it over time. The reality is that operations rarely unfold exactly as planned. 

 

  • Production levels change. 
  • Weather events occur. 
  • Assets become unavailable. 
  • Customer demand shifts. 

 

The ability to evaluate multiple scenarios before those changes occur can significantly improve decision-making. Rather than asking, "Can this plan work?", operators can ask: 

 

  • What happens if production increases? 
  • What happens if a trainset becomes unavailable? 
  • What happens if maintenance overruns by 24 hours? 
  • What happens if demand exceeds forecasts? 

 

Those questions provide options, and options create resilience. 

Connecting planning across the supply chain

This is why the Deswik RACE suite was developed. 

 

RACE helps bulk rail operators connect planning decisions across the broader supply chain, enabling teams to better understand how resources, constraints, and operational objectives interact. 

 

Whether evaluating train plans with RACE Planner, optimizing workforce deployment with RACE Crew, managing commodity movements with RACE Bulk Planner, or supporting operational execution, the goal remains the same: 


Helping operators make better decisions. Not just within a single department. Across the entire operation. 

 

When planners can evaluate scenarios, understand constraints, and compare alternatives, they gain greater confidence in the decisions they make every day. 

The bigger opportunity

The highest-performing bulk rail operations aren't necessarily those with the most assets or the largest networks. They are often the organizations with the deepest understanding of how their system works. 

 

They understand where value is created. They understand where constraints exist. 

 

And they understand how decisions in one part of the business impact outcomes elsewhere. Throughput is not simply a rail metric. It's a supply chain outcome. 

 

The operators who recognize that distinction are often the ones best positioned to improve performance, increase utilization, and uncover opportunities that others may miss. 

Learn more

Explore how the Deswik RACE suite helps bulk rail operators improve planning, optimize resources, and make better operational decisions across the supply chain: Deswik RACE 


Authors
Responsable du transport ferroviaire - Amérique du NordJon Jensen