Novedades y eventos

Siempre hay algo interesante en Deswik.

Me interesa

de artículos encontrados

Integrating infrastructure and production schedules

This paper provides recommendations for optimizing critical path by managing shared locations and materials in underground construction projects.

Blogabril 18, 2019Por Neil Tyson

El 2018 en cifras

En 2018, continuamos ampliando la capacidad de nuestro software y enfocándonos en la facilidad de uso para simplificar el trabajo de nuestros usuarios.

Noticias sobre el softwareenero 29, 2019

Block model knowledge for mining engineers

This paper has been written to introduce new mining engineers to mineral resource block models: their structure, the brands they may come across, the types they may come across, and issues that they will need to understand to avoid mistakes in their use.

Blogenero 18, 2019Por Julian Poniewierski

School of Mine partnership inspires educators and students alike

For the past five years, Lewis Meyer has taught Deswik software at the Camborne School of Mines at the University of Exeter. As Senior Lecturer in Mining Engineering, 257 students have graduated from Lewis’s Deswik course which consistently receives rave reviews from students.

Mediosoctubre 17, 2018

Mining for closure

This article, recently published in Global Mining Review, describes the modeling techniques tried and tested at an Australian mine. The mine needed a solution to produce a 3D visual landform which, while reducing costs, could also achieve desired rehabilitation objectives.

Blogoctubre 5, 2018Por Ian Neilsen

Deswik combina transporte con optimización y movimiento de materiales

La última actualización de Deswik cambiará la forma en que los ingenieros planifican la mina, al mismo tiempo que consideran las limitaciones de transporte y el desarrollo del relieve.

Noticias sobre el softwareoctubre 2, 2018

Deswik, socios orgullosos del congreso Planning for Closure

El próximo congreso de Planificación para el Cierre de Operaciones Mineras (Planning for Closure) ha demostrado ser la asociación ideal para Deswik.

Eventosoctubre 2, 2018

Deswik Copperbelt Conference 2018

We are pleased to invite our customers and partners from throughout Zambia and the Democratic Republic of Congo to see first-hand the value Deswik’s applications offer the Copperbelt region.

Eventosoctubre 1, 2018

Marcadores triangulares de pendiente

Los marcadores triangulares de pendiente (Triangle Slope Markers) proporcionan una herramienta gráfica sencilla para demostrar rápidamente el comportamiento de las superficies y de los sólidos tomando como base los requisitos del usuario.

Blogagosto 22, 2018Por Stephen Rowles

Latest integration improves accuracy and productivity in underground drill & blast mining

We’re pleased to welcome drill and blast technology manufacturer Minnovare as an integration partner, as part of our commitment to providing a flexible and integrated mine planning platform.

Noticias sobre el softwareagosto 1, 2018

Mejores prácticas para procesar datos de los vehículos aéreos no tripulados en Deswik

Dada la prevalencia de los vehículos aéreos no tripulados en la industria minera, las operaciones ahora tienen a su disposición una cantidad de datos sin precedentes que pueden usar.

Blogjulio 12, 2018Por Stephen Rowles

Deswik User Conference 2018: Technology change experts head speaker lineup

Two experts on technology and change management will be heading the lineup for the Deswik User Conference 2018.

Eventosjulio 9, 2018

Deswik proud partners of Life-of-Mine conference

The upcoming Life-of-Mine Conference has proven to be the perfect partnership for Deswik, who are proud to be a gold sponsor of the event being held in Brisbane on July 25 to 27.

Eventosjunio 29, 2018

Don’t forget the water! A common error in truck schedule modelling

This article looks at the impact of scheduling site trucks filled with dry tonnes from the block model rather than wet tonnes required by the trucking simulation.

Blogmayo 8, 2018Por Julian Poniewierski

Truck Schedule Modelling: Centre-Line vs. Truck Path

Is the industry standard practice of modelling trucking using the ramp centre-line, versus using the actual truck path an issue or not?

Blogabril 9, 2018Por Julian Poniewierski

Guidelines and considerations for open pit designers

This article has been written specifically for those who are new to pit design and may need some advice on how to undertake a pit design.

Blogmarzo 26, 2018Por Julian Poniewierski

Celebrating 10 years of mining innovation

It can be tough being a newcomer in an established industry but, after ten years in business, we have proved our staying power.

Mediosmarzo 19, 2018

Picture the future of mining

Deswik continues to bridge the gap between geology and mine planning. A new collaboration with Imago will extend the capability of Deswik’s operational geology platform.

Noticias sobre el softwaremarzo 14, 2018

2017 by the numbers

In 2017, we continued to work hard to improve and expand our support services for our users around the world. We’ve introduced many new tools and enhancements…

Noticias sobre el softwarefebrero 13, 2018

Short-range ore control modeling & design tool

Earlier this year, we released our short-range ore control modeling & design tool, Deswik.OPSTS to allow open pit mine planners to quickly produce short-term production plans from a single pit shell solid.

Blogdiciembre 13, 2017Por Wayne Romer

New survey features in Deswik.CAD 2017.1 & 2017.2

In 2017 there have been over 50 enhancements added to the roadmap and at present over 60% of them have been added into the CAD platform.

Blogdiciembre 13, 2017Por Stephen Rowles

Investing in future tech entrepreneurs

Deswik is pleased to support the RCL Accelerator program which provides funding, mentoring and support to start-ups in Brisbane, Australia.

Mediosnoviembre 29, 2017

Practical tools for integrated planning

Integrating landform engineering and closure cost calculations into your tactical mine planning delivers a more complete, overall view of the value of a project.

Blognoviembre 21, 2017Por Neil Tyson & Ian Neilsen

Introducing .DUF (Deswik Unified File) format

The Deswik Unifed File format (.DUF) is a new file format for faster loading and saving of CAD files. The bigger the file, the bigger the performance improvement

Blognoviembre 13, 2017Por Wesley Beere

Blend 2: multi-period destinations decisions

Maximize the value of your operation by optimizing the decision of where to send mined material across multiple periods.

Blognoviembre 13, 2017Por Mario Silva

Chilean recognition for innovative optimization

Our joint work with University Adolfo Ibáñez in Chile was recently recognized through the awarding of the Chilean National Prize of Technologic Transfer.

Mediosoctubre 30, 2017

New underground haulage solution

A technology preview of Deswik.LHS Underground is now available. Create your underground haulage network from your 3D mine model, and directly integrated with your schedule.

Blogoctubre 16, 2017Por Wayne Romer

Supporting Women in STEM

Deswik is pleased to take part in the Austmine Women in STEM: METS Career Pathway Program, aiming to support and promote women in STEM while improving gender diversity in the METS sector.

Mediosseptiembre 1, 2017

Deswik.Suite minimum and recommended specs

While there’s some basic underlying hardware requirements for Deswik.Suite to perform well, the hardware spec required for PCs / laptops can vary depending on your use case and data sizes.

Blogjulio 25, 2017Por Matt Chilcott

Deswik Suite 2017.1

Deswik is pleased to announce the release of Deswik.Suite 2017.1, a major release featuring 254 enhancements and two new modules.

Noticias sobre el softwaremayo 22, 2017

Coming soon: Deswik.LHS embedded in Deswik.Sched, Deswik.LHS for UG

From 2017.2 Deswik.LHS will be available as a plugin in Deswik.CAD & Deswik.Sched. Deswik.LHS will also be available for Underground mining operations.

Noticias sobre el softwaremayo 22, 2017

Deswik & Newtrax partner for integration of production control & scheduling

This partnership will enable operations to increase production & shift efficiency by combining short interval control planning & scheduling from Deswik with real time production data from Newtrax.

Mediosmayo 4, 2017

Plotting

What are the plotting elements and how do they fit together? In this two-part video series, we take you through an overview of our key plotting functions with tips on how to best set them up to minimize data replication.

Blogabril 23, 2017

Deswik Users Conference – Europe

9th – 11th May 2017. We invite our users and partners to join us in Skellefteå, Sweden for an informative two-day event on the latest industry trends and Deswik software advances.

Eventosabril 10, 2017

Pseudoflow explained

Everything you wanted to know about Pseudoflow but were afraid to ask… A discussion of Deswik Pseudoflow pit optimization in comparison to Whittle LG pit optimization.

Blogmarzo 8, 2017Por Julian Poniewierski

2016 by the numbers

Our awesome software team continues to deliver powerful tools for our users. Here’s a snapshot of the enhancements for the year…

Noticias sobre el softwareenero 24, 2017

DESWIK to unveil new operations scheduling tool at MinExpo 2016

Deswik announces the launch of Deswik.OPS, their new operational shift planning and tracking tool, which is set to revolutionize the way mines manage their daily operations.

Eventosseptiembre 22, 2016

Use of Reconciliation tool for End-of-Month process

Nova Project have been using Deswik.CAD’s reconciliation tool for their End-of-Month process. This has resulted in a higher quality report for the contractor on site and significant time savings.

Noticias sobre el softwareseptiembre 12, 2016

Deswik to showcase new mobile 3D scanning integration at ISM 2016

Deswik announces the inclusion of new mobile 3D scanning tools in its upcoming software release, version 2016.2.

Eventosagosto 26, 2016

DESWIK co-founder national finalist in EY Entrepreneur Of The Year

We’re pleased to announce that Wayne Romer has been selected as a national finalist in the 2016 EY Entrepreneur of The Year awards.

Mediosagosto 5, 2016

Deswik.Suite 2016.1 – Staff picks

Three months on since the release of Deswik.Suite 2016.1, we continue to explore some of the 2016.1 enhancements, with a selection of our team’s favorite new tools.

Blogjulio 6, 2016

Running Deswik.Suite on VDI platforms

We often get asked about running Deswik.Suite on virtualized platforms (VDI). Whilst technically challenging, it is still possible to run it effectively on a VDI platform under very specific conditions.

Blogjunio 7, 2016Por Matt Chilcott

The fall and rise of draglines

In a compelling article recently published in World Coal, Neil Tyson details ways to improve dragline engineering and in turn improve planning cycle time and mitigate complex risks.

Mediosmayo 18, 2016

Deswik to showcase new caving tool at MassMin 2016

Deswik will officially launch and showcase its new caving tool to the underground mining industry at MassMin 2016

Eventosmayo 5, 2016

Resource leveling algorithms: a comparison

Deswik.Sched has come a long way from version 1.2 where resource leveling could only be done on task priorities. There’s now three major leveling algorithms which support a myriad of features.

Blogabril 22, 2016Por Chris Hudson

Deswik.Suite 2016.1

Deswik is pleased to announce the release of Deswik.Suite 2016.1, a major release featuring 141 enhancements and two exciting new products.

Noticias sobre el softwaremarzo 30, 2016

Deswik.CAD – Survey functionality

Deswik.CAD now features in-built survey functions, commonly used by underground surveyors internationally.

Noticias sobre el softwaremarzo 30, 2016

New in 2016.1: Graphics in the scheduler

Graphics are now supported in the scheduler. The task graphics can be saved in the scheduler file and Deswik.Sched can be used stand-alone with animations.

Blogmarzo 30, 2016

2015 by the numbers

2015 has been another busy year for our software team. We take a look back at our major achievements:

Noticias sobre el softwarefebrero 29, 2016

Deswik Seminar at Mining World Russia

In conjunction with MiningWorld Russia 2016, Deswik will run a half-day seminar on “Solutions for effective mine planning“ on 27th April.

Eventosmarzo 29, 2016

Deswik.CAD integrates with Ventsim

In Deswik.Suite 2016.1, users will be able to export a network of tunnels directly from Deswik.CAD to a native Ventsim file.

Noticias sobre el softwarediciembre 14, 2015

Case study: Dawson Mine

With Deswik’s assistance, Anglo American’s Dawson mine managed to achieve significant haulage and engineering productivity improvements, directly reducing their cost per tonne of coal.

Noticias sobre el softwarediciembre 14, 2015

Deswik.Suite Portable (Application Virtualisation)

This article outlines outlines our application virtualisation solution for rapid deployment of Deswik.Suite updates

Blognoviembre 18, 2015Por Matt Chilcott

Coming soon in Deswik.Suite 2016.1

Plenty of new tools and features to look forward to in 2016 with the next release of Deswik.Suite. Find out more…

Noticias sobre el softwarediciembre 14, 2015

Exposibram (14th – 17th Sept) & Perumin (21st – 25th Sept)

Things have been busy for Deswik South America since the opening of our Santiago office (Chile). This month we continue to spread the word at key mining events in the region.

Eventosseptiembre 7, 2015

Deswik Software Suite v5.1 – New Features

Version 5.1 of the Deswik Suite is now available, featuring over 200 enhancements. Highlights for this release include…

Noticias sobre el softwareseptiembre 1, 2015

Deswik.Suite’s software release cycle – explained

This article explains the development methodology and release process for Deswik.Suite – and in particular why we release new versions and patches so frequently.

Blogagosto 31, 2015Por Matt Chilcott

Process maps in Deswik.CAD

Process maps have become a very important part of Deswik’s implementation strategy. They provide an easy, non-scripted solution to building streamlining repetitive tasks.

Blogseptiembre 1, 2015Por Wayne Romer

A holistic approach to mine planning

Minimizing risk of acid mine drainage: discover the techniques for integration of production and destination scheduling for planning engineered waste rock dumps and tailings management.

Noticias sobre el softwareagosto 26, 2015

Deswik software recognised for product innovation and excellence

Deswik has been announced as an ABA100 Winner for Product Innovation and Product Excellence in the Australian Business Awards 2015.

Mediosagosto 14, 2015

Deswik launch new software tool for dragline and dozer design

Deswik launches Deswik.DD, a sectional design & analysis tool for design, optimisation and communication for dragline or dozer push operations.

Noticias sobre el softwareagosto 10, 2015

Deswik expands into civil tunnelling market

We are pleased to announce our expansion into the civil tunnelling market with our new strategic partner Skarpa Pty Ltd.

Mediosjulio 29, 2015

Creating a pit design

In this short video, Deswik Technical Director Wayne Romer shows you how to create and adjust your pit design using expansion layers, bench ramps and switchbacks.

Blogjunio 10, 2015Por Wayne Romer

Dynamic block model interpolation in Deswik.CAD

Dynamic block model Interpolation with Deswik.CAD is quick and easy. In this video, we show you how to update a block model from blast hole data.

Blogjunio 10, 2015Por Wayne Romer

Scheduling improvements

The Scheduling Team continually works to improve the speed and performance of resource leveling. This quarter, we take a retrospective look at one of our clients’ schedule since it first arrived at Deswik in March 2012.

Blogjunio 10, 2015Por Steve Lever

Bridging the gap between geology and mine planning

DESWIK announces a technology partnership with ARANZ Geo Limited, developers of Leapfrog 3D geological modeling software.

Noticias sobre el softwaremayo 4, 2015

Deswik at Exponor 2015

Deswik Chile will once again have a booth in the Austrade pavilion at EXPONOR in Antofagasta between the 11th and 15th May 2015.

Eventosmarzo 24, 2015

Advanced Deswik.Sched training now available

The much anticipated Advanced Deswik.Sched module has also been published and has received positive feedback from numerous recipients.

Noticias sobre el softwaremarzo 24, 2015

Pivot Table Reporting

Deswik.Suite V5.0 contains some exciting new pivot table reporting functionality (found using the Deswik.LHS Reporting command, and called Pivot Table).

Blogmarzo 24, 2015

Value Impacts of Truck Limited Haulage

A study has been completed producing a mining schedule in conjunction with a dumping schedule and haulage analysis.

Noticias sobre el softwaremarzo 11, 2015

Deswik Software Suite v5.0 – New features

Version 5.0 of the Deswik software suite is now available, featuring some exciting new functions and improvements.

Noticias sobre el softwarefebrero 11, 2015

2014 by the numbers

Our software team has been busy this year continuously delivering improved solutions.

Noticias sobre el softwarediciembre 12, 2014

Deswik at the 2015 SME Annual Conference

Deswik will be participating in the 2015 SME Annual Conference and Expo in Denver, Colorado from 15th to 18th of February 2015.

Eventosdiciembre 10, 2014

Save The UQEM: Enhancing Our Industry Safety Culture

The UQEM plays an irreplaceable role in the Australian mining industry by bridging the gap between theory and practice at UQ. It is currently under review for closure.

Mediosdiciembre 10, 2014

Life’s too short to VDCL

We use this feature quite a bit here at Deswik. It still surprises me how many people don’t know about the DCF file format. VDCL is the original Deswik.CAD file format.

Noticias sobre el softwarediciembre 3, 2014Por Wayne Romer

Impacts of IPCC on Pit Shell Optimization

This case study outlines the process followed in the Deswik Software Suite to compare trucked material movements and an alternative strategy of semi-mobile in-pit crushing and conveying.

Noticias sobre el softwarediciembre 11, 2014

Deswik gains international attention

Deswik was awarded the Dermot McManus Award for Leadership and Innovation at the Premier of Queensland’s Export Awards on Thursday 16th October.

Mediosoctubre 30, 2014

Deswik Goes Back to University

Deswik are pleased to announce the provision of Deswik Software for use by Mining Engineering students at UQ.

Mediosfebrero 22, 2013

Deswik and RWE form Continuous Mass Mining Partnership

Deswik partners with RWE to launch the first generation of mine planning tools for CMM applications.

Mediosoctubre 3, 2013

Deswik.Suite v4.0 Released

V4.0 brings enhancements across the entire toolset and represents the largest release from Deswik to date.

Noticias sobre el softwareseptiembre 11, 2013

Net Present Value Optimization at Vale

SOT+ case study kicks off at Vale – advancing mine plan optimization.

Mediosseptiembre 11, 2013